Freight Rates Thailand to India | FCL Shipping & Transit Times

India's imports from Thailand in 2024 were about US$8.9B. Direct sailings like Thailand → India can be as low as 10–20 days. Get live prices, schedules and documents.

Total trade

US$8.9B

India imports from Thailand, 2024 (UN Comtrade/DGCIS)

Two-way trade

US$15.2B

Two-way trade 2024/25

Typical transit

10–20 days

Direct Laem Chabang–India services typically ~10–16d; transshipment or feeder routings via Singapore/Port Klang up to ~20d.

Port throughput

8.1M TEU

Thailand's largest port Laem Chabang handles 8.1M+ TEU annually. Major hub for Thailand–India and intra-Asia services.

Trade Snapshot: Thailand → India

US$8.9B
India imports from Thailand, 2024 (UN Comtrade/DGCIS)
YoY:↑ 5.2% vs 2023
US$15.2B
Two-way trade 2024/25
Indicative of sustained interdependence.
10–20 days
Typical FCL transit
Direct Laem Chabang–India services typically ~10–16d; transshipment or feeder routings via Singapore/Port Klang up to ~20d.
8.1M TEU
Laem Chabang port throughput 2024
Thailand's largest port Laem Chabang handles 8.1M+ TEU annually. Major hub for Thailand–India and intra-Asia services.

Top Commodities Traded (ThailandIndia)

From DGCI&S / analysis briefs & sector reports

Electrical Machinery (HS-85)

Electronic components, electrical equipment, consumer goods. ~US$2.4B (2024).

Plastics & Polymers (HS-39)

Plastic resins, polymers, plastic articles. ~US$1.8B (2024).

Rubber & Articles (HS-40)

Natural rubber, rubber products, tires. Thailand is world's largest rubber exporter. ~US$1.5B (2024).

Organic Chemicals (HS-29)

Chemical products, pharmaceutical ingredients. ~US$1.2B (2024).

Major Ports & Transit Benchmarks

Benchmarks are indicative; use live schedules for ETAs

Origins (Thailand):

Laem ChabangBangkokMap Ta PhutSongkhlaSriracha

Destinations (India):

Nhava Sheva (JNPT Mumbai)MundraChennaiKattupalliKolkata

Carriers:

MSCMaerskCMA CGMHapag-LloydCOSCOONEEvergreen
Unable to load map for this port pair. Please try another row.
Port PairServiceTransitCut-off (typ.)Free Days
Laem Chabang → Nhava Sheva (JNPT)Direct / T/S10–14 daysVGM D-2 / CY D-114–21
Laem Chabang → MundraDirect / T/S12–16 daysVGM D-2 / CY D-114–21
Bangkok → ChennaiTransshipment12–18 daysVGM D-2 / CY D-17–14
Laem Chabang → ChennaiDirect / T/S12–16 daysVGM D-2 / CY D-114–21

Instant Rate Levels

Selected: Laem Chabang → Nhava Sheva (JNPT) 20' GP
USD 800 1,150

Spot all-in (Ocean+BAF) illustration; excludes local charges & taxes

730
112

Why Choose Cogoport for ThailandIndia?

Data-backed guidance • Transparent pricing • Reliable execution

Wide Carrier Coverage

Direct + T/S options across major services, balanced for time vs cost.

Transparent Rate Build-ups

See base, surcharges, and local charges before you book.

Compliance & Docs

AD Code, ICEGATE, COO, fumigation, license checks—built in.

Saved 9% on our container runs
CogoAI lane suggestions optimized our Thailand to India shipments. – Importer
Reliable space in peak weeks
Contract bench helped us lock volume smartly. – Trader

Frequently Asked Questions

Still have questions?
For assistance, please visit our Contact Us page.
Our dedicated team is ready to help you on your journey to a greener, more sustainable future